{"id":2904,"date":"2014-06-19T17:00:21","date_gmt":"2014-06-19T15:00:21","guid":{"rendered":"https:\/\/www.emcombustion.es\/em-combustion-se-adjudica-un-contrato-para-la-central-termica-de-suez-egipto-2\/"},"modified":"2022-12-16T16:43:46","modified_gmt":"2022-12-16T15:43:46","slug":"em-combustion-awarded-a-gasoil-burner-contract-for-the-thermal-plant-in-suez-egypt","status":"publish","type":"post","link":"https:\/\/emcombustion.es\/en\/em-combustion-awarded-a-gasoil-burner-contract-for-the-thermal-plant-in-suez-egypt\/","title":{"rendered":"E&#038;M Combusti\u00f3n awarded a contract for the thermal plant in Suez (Egypt)"},"content":{"rendered":"<p><a href=\"https:\/\/www.emcombustion.es\/wp-content\/uploads\/2014\/06\/Suez.jpg\" target=\"_blank\" rel=\"noopener\" data-rel=\"lightbox-gallery-qLhypwIb\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1601 size-full\" title=\"Combined Cycled Thermal Plant | Gasoil Burner | Suez | Egipto\" src=\"https:\/\/emcombustion.es\/wp-content\/uploads\/2014\/06\/Suez.jpg\" alt=\"Combined Cycled Thermal Plant | Suez | Gasoil Burner\" width=\"300\" height=\"300\" srcset=\"https:\/\/emcombustion.es\/wp-content\/uploads\/2014\/06\/Suez.jpg 300w, https:\/\/emcombustion.es\/wp-content\/uploads\/2014\/06\/Suez-150x150.jpg 150w, https:\/\/emcombustion.es\/wp-content\/uploads\/2014\/06\/Suez-50x50.jpg 50w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><a href=\"https:\/\/emcombustion.es\/en\/the-company-technical-solution-industrial-combustion\/internationalization-industrial-burners-and-combustion-equipment\/\"><strong>E&amp;M Combusti\u00f3n<\/strong><\/a> has been awarded a contract for the <strong>installation of a 40 MW <a href=\"https:\/\/emcombustion.es\/en\/industrial-burners-em-combustion\/\">burner<\/a><\/strong> at the combined cycle thermal plant in Suez, <strong>Egypt<\/strong>. This equipment will be of the type of\u00a0gasoil burner.<!--more--><\/p>\n<p>The project is headed by Initec and the boiler is to be made by Lointek. The burner <strong>will operate with air-atomised gasoil<\/strong> and will be required to comply with a modulation range of 1:10. Furthermore, it is required to fulfil <strong><a href=\"https:\/\/emcombustion.es\/en\/industrial-burners-em-combustion\/atex-and-nec-burners\/\">US NEC directives and standards<\/a><\/strong>, with two out of three safety systems.<\/p>\n<p>The plant, located on the outskirts of the city of Suez, <strong>is 130 km away from the capital Cairo<\/strong>.<\/p>\n<p>This new project is a further confirmation of <strong>our success in the market for <a href=\"https:\/\/emcombustion.es\/en\/references-burners\/operating-sectors\/petrochemical-and-refinery-industrial-burners-generators-heaters\/\">special manufactures for the refinery<\/a><\/strong>, petrochemical and energy sectors.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>E&amp;M Combusti\u00f3n has been awarded a contract for the installation of a 40 MW burner at the combined cycle thermal plant in Suez, Egypt. This equipment will be of the type of\u00a0gasoil burner.<\/p>\n","protected":false},"author":1,"featured_media":2530,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[98,97,83],"tags":[100,102,866,101],"class_list":["post-2904","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contratos-en","category-generacion-de-energia-en","category-news-industrial-combustion-equipment","tag-ciclo-combinado-en","tag-egipto-en","tag-quemador-en","tag-central-termica-en"],"_links":{"self":[{"href":"https:\/\/emcombustion.es\/en\/wp-json\/wp\/v2\/posts\/2904","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/emcombustion.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/emcombustion.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/emcombustion.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/emcombustion.es\/en\/wp-json\/wp\/v2\/comments?post=2904"}],"version-history":[{"count":0,"href":"https:\/\/emcombustion.es\/en\/wp-json\/wp\/v2\/posts\/2904\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/emcombustion.es\/en\/wp-json\/wp\/v2\/media\/2530"}],"wp:attachment":[{"href":"https:\/\/emcombustion.es\/en\/wp-json\/wp\/v2\/media?parent=2904"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/emcombustion.es\/en\/wp-json\/wp\/v2\/categories?post=2904"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/emcombustion.es\/en\/wp-json\/wp\/v2\/tags?post=2904"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}